I am looking at a SCM record 1 matrix table router. I need to load onto a lorry but the machine at 3 tons is too big for the guys crane lift.
The only option I have is too froklift the machine onto the lorry, by lifting the machine from underneath with the forklift tines.
The question that is on my mind is, do I walk away from making a deal because I can't lift the machine with a crane or do I risk lifting with a forklift? What are the potential mistakes when using a forklift?
Gav
The only option I have is too froklift the machine onto the lorry, by lifting the machine from underneath with the forklift tines.
The question that is on my mind is, do I walk away from making a deal because I can't lift the machine with a crane or do I risk lifting with a forklift? What are the potential mistakes when using a forklift?